Environmental monitoring during the operational phase of projects
ASSIGNING AGENCY:
YEAR:
DESCRIPTION:
NCC undertakes programmes to record and monitor the state of biodiversity on the sites of all types of projects after construction and during their operational phase.
Indicative projects
Airports
- Seagull monitoring programme at 4 Regional Airports | 2023-present | Fraport Greece
- Vegetation monitoring programme at 5 Regional Airports | 2023-present | Fraport Greece
Natural gas pipelines
- Monitoring programme for vegetation, large mammals, avifauna and fish fauna along the Trans Adriatic Pipeline in Northern Greece | 2023-present | RSK Environment Limited
ASPHE
- Ornithological monitoring programme during the operation phase of the ASPIE “Koutsoutsoytis” in the Municipality of Afandos Rhodes | 2023-present | ENEL Green Power Hellas S.A.
- Ornithological field study during the operation phase of the ASPEs “Tsouka”, “Agios Vasilios – Megali Rachi” and “Aspri Rachi – Misochori” in the Municipality of Karystos Evia | 2018-2023 | Ch. ROKAS S.A.
- Ornithological monitoring programme during the operational phase of the Kryes, Achladia and Anemoessa ASPHEs in Sitia, Crete | 2018-2020 | ENERCON GmbH
- Environmental monitoring program for the Varnounta Wind Farm at Toumba – Anthovouni | 2012-2014, 2018-2020 | RENINVEST/Anemos Macedonia S.A.
- Monitoring of impacts on avifauna from the operation of the ASPIE at Vigla Kattavia, Rhodes using an ornithological radar| 2013-2015 | PPC Renewables SA.
Energy Transmission Lines
- Ornithological monitoring program for the transmission line of the Small Hydroelectric Power Plant “Dafnozonara – Sanidi” in the Prefectures of Arta, Karditsa and Aitoloakarnania | 2023-present | TERNA ENERGY S.A.
> Index of projects