Environmental monitoring during the operational phase of projects

ASSIGNING AGENCY:

YEAR:

DESCRIPTION:

NCC undertakes programmes to record and monitor the state of biodiversity on the sites of all types of projects after construction and during their operational phase.

Indicative projects

Airports

Natural gas pipelines

  • Monitoring programme for vegetation, large mammals, avifauna and fish fauna along the Trans Adriatic Pipeline in Northern Greece | 2023-present | RSK Environment Limited

ASPHE

  • Ornithological monitoring programme during the operation phase of the ASPIE “Koutsoutsoytis” in the Municipality of Afandos Rhodes | 2023-present | ENEL Green Power Hellas S.A.
  • Ornithological field study during the operation phase of the ASPEs “Tsouka”, “Agios Vasilios – Megali Rachi” and “Aspri Rachi – Misochori” in the Municipality of Karystos Evia | 2018-2023 | Ch. ROKAS S.A.
  • Ornithological monitoring programme during the operational phase of the Kryes, Achladia and Anemoessa ASPHEs in Sitia, Crete | 2018-2020 | ENERCON GmbH
  • Environmental monitoring program for the Varnounta Wind Farm at Toumba – Anthovouni | 2012-2014, 2018-2020 | RENINVEST/Anemos Macedonia S.A.
  • Monitoring of impacts on avifauna from the operation of the ASPIE at Vigla Kattavia, Rhodes using an ornithological radar| 2013-2015 | PPC Renewables SA.

Energy Transmission Lines

  • Ornithological monitoring program for the transmission line of the Small Hydroelectric Power Plant “Dafnozonara – Sanidi” in the Prefectures of Arta, Karditsa and Aitoloakarnania | 2023-present | TERNA ENERGY S.A.

> Index of projects