AA for the Poseidon Pipeline in its marine section
ASSIGNING AGENCY:
ASPROFOS S.A.
YEAR:
2023
DESCRIPTION:
A Special Ecological Assessment was prepared for the marine section of the Greece-Italy Poseidon interconnecting pipeline for Special Conservation Area GR2230004.
Specialised fieldwork was carried out for the recording of marine mammals and seabirds from the sea and the search for Mediterranean seal shelters, as well as recording the current status of the Poseidonia grasslands.
> Index of projects

